快盈500个人主页

快盈500个人主页为您提供临边护栏、木工防护栏、工程围挡等相关信息发布和相关资讯,敬请关注!
新闻
联系我们
咨询电话
15866735826

联系:张经理

手机: 15866735826

快盈500个人主页邮箱: 394441862@qq.com

网址:http://pashaishaji.com/

快盈500个人主页地址:山东省济南市章丘圣井工业园

当前位置: 首页 > 新闻中心 > 常见问题

木工加工棚的安装和拆除水平保护装置之前做法

来源:http://pashaishaji.com/   发布时间:2022-06-17

木工加工棚是施工过程中操作人员或行人的通道,过往人员的加工棚是双层的。从悬臂式脚手架的悬臂开始,每隔十米设置一个悬臂式加工棚,可以更好地保证人在加工棚下行走的。木工加工棚的安装和除水平保护装置之前做法是怎样的?
The woodworking shed is a passageway for operators or pedestrians during construction. The processing shed for passing personnel is double-layer. Starting from the cantilever of the cantilever scaffold, a cantilever processing shed is set every ten meters, which can better ensure the safety of the witness walking under the processing shed. What was the practice before the installation of woodworking shed and the removal of Horizontal protective devices?
在安装和拆除水平保护装置之前,请进行技术交底。高空作业人员经过技术培训和考试,持证上岗。加工棚所用钢管、扣件等材料符合JGJ130-2011《建筑用扣件式钢管脚手架技术规范》及相关标准的要求。水平加工棚安装、拆卸时,操作人员的“三宝”齐全,使用正确。木工加工棚架设和拆除时,应避免上下同时作业,作业时间要错开。
Before installing and removing the horizontal protection device, please conduct safety technical disclosure. The personnel working at heights shall receive professional technical training and professional examination and work with certificates. The steel pipes, fasteners and other materials used in the processing shed shall meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with couplers for construction and relevant standards. During the installation and disassembly of the horizontal processing shed, the "three safety treasures" of the operators shall be complete and used correctly. During the erection and removal of the woodworking shed, it shall be avoided to operate up and down at the same time, and the operation time shall be staggered.
木工加工棚
安装和拆除加工棚时,所有材料和工具应堆放在距建筑物外缘少2m的地方,堆放高度不应超过1m。拆除的材料应及时运地面并运走,严禁高空抛掷。施工和拆除加工棚时,应在地面设置警戒区,并指定专人监控。搭建和拆除加工棚时,应指定专人指导。
When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The removed materials shall be transported to the ground and away in time, and it is strictly prohibited to throw them from high altitude. During the construction and removal of the processing shed, a warning area shall be set on the ground and a special person shall be appointed to monitor it. When setting up and removing the processing shed, a special person shall be appointed for guidance.
管理人员应注意眼睛、腿和嘴,并采取有效的防护措施处理危险情况,确保人员。阴雨大风天气,应暂停加工棚的架设和拆除,检查和维护加工棚的质量。加工棚搭建完成后,经专职人员验收后方可投入使用。水平保护架设和拆除前,应进行技术交底。
Management personnel shall pay attention to eyes, legs and mouth, and take effective safety protection measures to deal with dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and removal of the processing shed shall be suspended, and the quality of the processing shed shall be inspected and maintained. After the construction of the processing shed is completed, it can be put into use after being accepted by full-time safety personnel. Before the erection and removal of horizontal protection, safety technical disclosure shall be conducted.
由此我们了解到,在安装木工加工棚时,一定要注意施工。施工人员应按施工要求进行施工,同时保证施工质量,达到保护的作用,从而达到我方施工的目的。
From this, we know that we must pay attention to construction safety when installing the woodworking shed. The construction personnel shall carry out the construction according to the construction requirements, ensure the construction quality and achieve the protection effect, so as to achieve the purpose of our construction.
以上就是今天为大家分享的关于问题的相关内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://pashaishaji.com
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://pashaishaji.com 。